+44(0)1565 722609


State of the art Laboratory and Stability Storage Facility

Airology System News.

Project Description

For Intertek at Melbourn in Cambridge, Airology Systems has designed, supplied, installed and commissioned of a state of the art Laboratory and Stability Storage Facility.

The Solution

The solution provided by Airology Systems included heat/cool inverter air conditioning, ventilation system, mezzanine floor, partitioning, ceilings, floor coverings, lighting and electrical services.

The client commented “During the initial design and build we worked closely with Airology to create a facility that will provide one of the most comprehensive GMP stability storage and testing services in Europe. Working with Airology enabled us to deliver a significant building project, on-scope, on-time and on-budget.”

The facility was officially opened in Royston in May, quadrupling the current European capacity. The facility will provide controlled environment stability storage for global pharmaceutical, consumer healthcare and medical device clients. A range of storage solutions covering ICH (Q1A(R2)) conditions are available, as are options for client bespoke conditions and risk management storage space.



Moorfield Nanotechnology