feature_hp

Case Study: Hewlett Packard

Application

Optical mask alignment

Problem

Helwett Packard’s existing cleanroom was operating at ISO 7 or class 10,000. Their mask alignment process required an ISO 5 or Class 100 environment.

Solution

As with BAE Systems we built a custom sized Clean Shower within the existing cleanroom, creating a micro climate in which we could house the mask aligner.

Share this post

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp