case_bae

Case Study: BAE Systems

Problem

BAE’s existing cleanroom was operating at class 10,000, ISO 7. Their process required Class 1,000, ISO 6 environment.

Solution

To keep costs to a minimum we built a custom sized Clean Shower within the existing cleanroom, creating a low particulate micro climate tailored to their process.

Share this post

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp