Airbus Defence & Space

Case Study: Airbus Space & Defence

Application

Satalite instrument assembly and testing

Problem

Airbus needed to control particulate to ISO 5, molecular, electrostatic and magnetic contamination for the European Space Agency’s Solar Orbiter satellite mission.

Solution

We designed and supplied a Clean Cube to sit in their ISO 8 facility. Due to time restrictions we built the frame as a complete unit and lift into position fitting the glass infill panels and electrics once the Clean Cube was in position.

Share this post

Share on facebook
Share on twitter
Share on linkedin
Share on whatsapp