State of the art Laboratory and Stability Storage Facility

Traditional Cleanrooms

Airology System News. Project Description For Intertek at Melbourn in Cambridge, Airology Systems has designed, supplied, installed and commissioned of a state of the art Laboratory and Stability Storage Facility. The Solution The solution provided by Airology Systems included heat/cool inverter air conditioning, ventilation system, mezzanine floor, partitioning, ceilings, floor coverings, lighting and electrical services. The […]

Read More…

Design & Build ISO Class 6 Cleanroom Facility

Design & Build ISO Class 6 Cleanroom Facility

Airology System News. Project objective: With a requirement to bring in-house a product previously out-sourced, our client, a leading provider of cleanroom garments, consumables and medical devices to the healthcare sector, chose us as Principal Contractor and consultant for a new cleanroom build in Lincolnshire. The requirement was for an ISO Class 6 / EU GMP […]

Read More…

Case Study: Timpson

  Application Mobile phone screen recycling Problem Timspsons were expanding their mobile and tablet maintenance division and needed advice on a suitable environment in which to operate. Solution We designed and supplied them with the components necessary to build a simple ISO 7, class 10,000 cleanroom in which the screens can be laminated. The components […]

Read More…

Case Study: Selex Sensors And Airborne Systems

Application Lasers Problem Selex wanted to do a very quick change to get a microclimate inside their existing Class 10,000, ISO 7 cleanroom to perform a critical application in a Class 1,000, ISO 6 environment. Solution A CT 1700 was erected inside their cleanroom with our technicians working alongside Selex staff to install the required […]

Read More…

Case Study: Airbus Space & Defence

Airbus Defence & Space

Application Satalite instrument assembly and testing Problem Airbus needed to control particulate to ISO 5, molecular, electrostatic and magnetic contamination for the European Space Agency’s Solar Orbiter satellite mission. Solution We designed and supplied a Clean Cube to sit in their ISO 8 facility. Due to time restrictions we built the frame as a complete […]

Read More…

Case Study: Dolby

Application LCD screen repairs Problem Dolby wanted to test the viability of performing a repair to their LCD monitors in the UK but needed a ISO 6, Class 1,000 environment which had anti-static, ESD capabilities. Solution Moorfield’s Clean Environments supplied a standard CT 750 with ESD re-usable flooring. […]

Read More…