Case Study: Warwick University

Application Chemistry department Problem Warwick University required a teaching ISO 7 cleanroom Solution Warwick opted for a design and build solid walled cleanroom with pass

Read More »
VWR Basan
Case study

Case Study: VWR Basan

Application Pharmacutical packing Problem Provide a disaster recovery plan for their packing division. Solution VWR are a distributor of the Clean Tent and so know

Read More »
The Boeing Company
Case study

Case Study: Boeing

Application Aviation Problem Boeing needed to perform works to the top of the fuselage of the 777 in a clean environment. Solution We provided Clean

Read More »
Rexroth Bosch
Case study

Case Study: Bosch Rexroth

Application Hydraulic valves Problem Bosch needed a ISO 7 cleanroom for a project that was split between two of their sites Solution To maximise their

Read More »
Continental
Case study

Case Study: Continental

Application Automotive Problem Continental needed to test an R and D project in an ISO 6 cleanroom Solution We installed a Clean Tent in their

Read More »
SciLabware
Case study

Case Study: SciLabware

Application Medical glassware Problem SciLabware needed a cleanroom in their new facility. Solution We designed, built and supplied them with a much larger cleanroom to

Read More »
Case study

Case Study: Precious Cells

Application Stem cell harvesting and storage Solution We designed, supplied and installed a suite of three interconnecting cleanrooms within their existing offices.